Good morning,
The labor time for a shop is 1 hour per hose. If you were trying to attempt it, I would assume you would need at least 2 hours as you do not have a lift to make the job easier.
The one thing that is tough is getting the hoses started back on the steering rack. You need the correct angle, or they will not start correctly. You could easily cross thread the hole which would require replacing the rack and pinion.
Roy
Sep 30, 2021 at 5:41 AM